Installation Examples Page 2

Click on the thumbnail images or in the red circles
 to view construction details.

Private Residence, Laguna Beach, CA

laguna1.jpg (16102 bytes) Used in this project:
1/8" Stainless Steel
1x19 Cable - TOP HAT terminal
PCTH.04.6M.100

balcony1.jpg (21704 bytes)

balcony2.jpg (22293 bytes) balcony3.jpg (20545 bytes) UCSD Medical Building
San Diego, CA

Frame by S+R Metal, Buena Park, CA.  Cable by PC&S

Cable used for this installation is 3/16"  1x19 Stainless Steel and 
PCTH.06.6M.100

parking1.jpg (35750 bytes)

 

Glendale, CA
Parking Structure.  
Frame by Red's Iron, San Fernando, CA
Cable by PC&S

Materials are:
3/16 " 1x19 Stainless Steel.  End terminal, PCTH.06.6M.100.
Angle shims for stairs slopes.

 

parking3.jpg (37751 bytes)

parking2.jpg (28675 bytes)
parking4.jpg (66271 bytes) Executive parking.
River Walk Golf Course, Mission Valley, San Diego, CA.

Materials:
1/4" 1x19 Stainless Steel
PCTJ.08.10 and PCTB.T.08.10

Colburn School for the Performing Arts, Los Angeles, CA
Frame by Columbia Steel, Rialto, CA.
Cable by PC&S.
Segerstrom, IBT headquarters entrance.  South Coast Plaza, Costa Mesa, CA.  

Frame by Plas-Tal, cable by PC&S.

For close up of these areas click on circle.

Material used:
7/8" 1x19 Stainless Steel with custom turnbuckle.
1" 1x19 Stainless Steel
1 1/4" 1x19 Stainless Steel

Click here to return to the first examples page.

 

Top Hat  Hardware  Fabrication  Examples  FAQ's  Contact  Links  Home

E-mail:  info@prescable.com

Web Site Maintenance by Web Source Options